Coal News Hubb
Advertisement Banner
  • Home
  • News
  • Coal Mining
  • Contact
No Result
View All Result
  • Home
  • News
  • Coal Mining
  • Contact
No Result
View All Result
Wellnessnewshubb
No Result
View All Result
Home Coal Mining

Champion mulls $470m project to upgrade Bloom Lake product

admin by admin
January 28, 2023
in Coal Mining


Friday, January 27th, 2023

Canada-based Champion Iron is mulling a $470.7-million investment for a direct reduction pellet feed (DRPF) project at Bloom Lake, Quebec, which will further contribute to reducing emissions in the steelmaking process.

The project will upgrade Bloom Lake’s iron-ore concentrate to a DRPF-quality product of 69% iron content, which should attract a substantial premium over Bloom Lake’s current high-grade 66.2% iron-ore concentrate.

“The project, leveraging the rare purity of our resources, positions our company to participate in the accelerating transition in the steel industry to reduce emissions, and offers the opportunity to generate significant returns on investments while creating additional positive impact with quality jobs for the region,” said CEO David Cataford on Thursday.

A feasibility study evaluating flowsheet modifications to the Bloom Lake Phase 2 plant and infrastructure required to upgrade its current production to DRPF grade iron-ore, delivered positive results. The average life-of-mine production will be about 7.5-million tonnes a year of DRPF quality iron-ore at 69% iron with combined silica and alumina content below 1.2%.

High-purity DRPF product is a primary ingredient required in the green steel supply chain to produce high-quality and complex steel in the direct reduced iron and electric arc furnaces process, reducing carbon dioxide equivalent emissions by more than 50%, compared with the conventional steelmaking route using blast furnace and basic oxygen furnace.

A feasibility study yielded a net present value of $738.2-million and an internal rate of return of 24%, after tax.

Meanwhile, TSX- and ASX-listed Champion reported that Lake Phase 2 expansion to 15-million tonnes a year had reached commercial production in December.

“The Phase 2 investments at Bloom Lake should contribute to normalising operating costs per tonne sold as we continue to ramp up the project towards nameplate capacity, which we anticipate achieving in the near term,” said Cataford.

The Phase 2 expansion has helped to increase production of 2.95-million wet metric tonnes (wmt) of high-grade 66% iron concentrate for the December quarter, representing an increase of nearly 50% compared with 2.03-million wmt for the same period in 2021.

C2 cash costs jumped to C$76/dry metric tonne (dmt) in the three-month period, from C$59.5/dmt in the same period of 2021.

Champion generated revenue of C$351.2-million, up from C$253-million in the same period of 2021.

Filed under: News

No Comments »



Source link

Previous Post

Ironveld partners Pace to produce DMS-grade magnetite

Next Post

‘Timing is right’ for NWT to harness critical minerals boom, says minister

Next Post

‘Timing is right’ for NWT to harness critical minerals boom, says minister

Recommended

Hastings to buy strategic stake in Neo Performance Materials

7 months ago

Zimbabwe’s ban on lithium ore exports triggers stockpile buildup

1 week ago

© 2022 Coal News Hubb All rights reserved.

Use of these names, logos, and brands does not imply endorsement unless specified. By using this site, you agree to the Privacy Policy and Terms & Conditions.

Navigate Site

  • Home
  • News
  • Coal Mining
  • Contact

Newsletter Sign Up.

No Result
View All Result
  • Home
  • News
  • Coal Mining
  • Contact

© 2022 Coal News Hubb All rights reserved.